CMMC for DLA Suppliers: What RD004, L40 and Other DIBBS Codes Require Now
By The Defense Compliance Report Editorial Team · Last verified: November 13, 2026
General information for the defense industrial base, not legal, contractual or compliance advice. Not affiliated with DoD, the Department of War, the Defense Logistics Agency (DLA), The Cyber AB, NIST or any government agency. The solicitation and your contracting officer control what applies to your quote.
Short answer: DLA puts CMMC into its buys through codes you can see on the RFQ: DFARS 252.204-7021 and 252.204-7025, DLA procurement notes such as L39 (Level 1 self-assessment) and L40 (Level 2 self-assessment), and technical and quality codes RD004 and RD005. They do not all mean the same thing today. Procurement note L40 and a 7021 clause naming Level 2 (Self) make a current Level 2 self-assessment in SPRS a condition of award now. A DLA office at Portsmouth Naval Shipyard posted exactly that on November 10, 2026. RD004 on its own is a phase-in notice. DLA's June 12, 2026 master list says posting a Level 2 self-assessment is optional until November 10, 2028 and required after that date. Since the July 13, 2026 CMMC Phase 2 suspension, DLA can only require Level 1 (Self) or Level 2 (Self), so RD005's third-party (C3PAO) path can't be imposed during the review. DFARS 252.204-7012 still applies whenever the item carries covered defense information.
Who this page is for
- Manufacturers quoting on DIBBS, such as machine shops, electronics and cable assemblers, and makers of Class IX repair parts that come with drawings.
- Distributors, dealers and resellers that quote DLA part-numbered items and pass the technical data package to a manufacturer.
- DLA Troop Support vendors for subsistence (Class I), clothing and textiles (Class II), construction and equipment (Class IV) and medical materiel (Class VIII).
- DLA Energy suppliers of fuel, natural gas and electricity.
- Service contractors for DLA Distribution, DLA Disposition Services and DLA's contracting services office (DCSO), which DLA expects to see the highest CMMC levels.
If you sell to a prime instead of to DLA, the same rules reach you through the prime's flowdown. CMMC for subcontractors covers that path. This page covers what DLA itself writes into its solicitations.
Where CMMC shows up in a DLA solicitation
DLA's Cybersecurity Resources for Suppliers page says CMMC requirements appear "through Clauses, Procurement Notes, and Standard Text Objects (STOs)." On DIBBS, the technical and quality codes add another layer. Here is what each code means on November 13, 2026.
| Code on the RFQ | What it says | What you need now | Source |
|---|---|---|---|
| DFARS 252.204-7021 | Contractor compliance with the CMMC level in the solicitation | A current CMMC status in SPRS at the stated level, or higher, at award | DFARS 252.204-7021 |
| DFARS 252.204-7025 | Notice of the CMMC level required | Read it for the level; it travels with 7021 | DFARS 252.204-7025 |
| Procurement note L39 | CMMC Level 1 self-assessment requirement for federal contract information (NOV 2025) | Final Level 1 (Self) in SPRS, affirmed | DLA Energy amendment A0009 to SPE604-25-R-0405 |
| Procurement note L40 | CMMC Level 2 self-assessment requirement (NOV 2025) | Conditional or Final Level 2 (Self) in SPRS, affirmed, before award | Solicitation SPMYM327Q2006 |
| RD004 | Item's technical data is CUI in the Controlled Technical Information category; Level 2 self-assessment phase-in | Optional until November 10, 2028; required after | DLA Master List of Technical and Quality Requirements, Version 44 |
| RD005 | Item's technical data is export-controlled CUI; Level 2 C3PAO phase-in | Optional until November 10, 2028; required after, unless DoD changes the program first | DLA master list, Version 44 |
| RD002 | Item or its data contains covered defense information | DFARS 252.204-7012 safeguarding: NIST SP 800-171, 72-hour incident reporting, FedRAMP Moderate or equivalent cloud | DLA master list; DFARS 252.204-7012 |
| RD003 | Covered defense information may apply later | No NIST SP 800-171 assessment in SPRS needed to win; if you generate CDI during performance, 7012 applies and you must tell the contracting officer and post an assessment | DLA master list |
| 52.240-93 or 52.204-21 | Basic safeguarding of contractor systems that hold FCI | The 15 Level 1 safeguards | FAR overhaul part 40 |
| 252.240-7997 or 252.204-7019 and 7020 | NIST SP 800-171 DoD assessment requirements | Access for government Medium or High assessments; older-format buys still use 7019 and 7020 | Class Deviation 2026-O0025, Revision 3 |
The clause numbers in the last two rows changed under the Revolutionary FAR Overhaul. FAR 52.204-21 now appears as 52.240-93, and DFARS 252.204-7020 appears as 252.240-7997 in solicitations issued under the Part 240 class deviation. DFARS 252.204-7019 and 7020 explained walks through the renumbering. The CMMC clauses, 7021 and 7025, kept their numbers.
RD004 versus L40: an option now or a condition of award
These two codes are easy to confuse, and they lead to different answers.
DLA's master list, Version 44 (June 12, 2026), says of RD004: "On November 10, 2025 contractors requiring access to CTI technical data for a DLA procurement solicitation or contract have the option to upload a CMMC Level 2 Self-Assessment." It continues: "After November 10, 2028, contractors must have a completed CMMC Level 2 Self-Assessment uploaded to SPRS to be eligible for this contract award." RD005 uses the same structure for a C3PAO certification and export-controlled data.
Procurement note L40 is different. When a solicitation carries L40 with clause 7021, the contracting officer can't award to you without the required status in SPRS. The deviation that DoD contracting officers use today says they "must check SPRS and not award a contract, task order, or delivery order to an offeror that does not have a current CMMC status posted in SPRS at the CMMC level... required by the solicitation, or higher."
Four recent DLA actions show how this looks on real buys:
| Solicitation | DLA activity | Posted | CMMC language | What it means |
|---|---|---|---|---|
| SPE7M127T2004, circuit card assembly, NSN 5998-01-497-4784 | DLA Land and Maritime | November 5, 2026 | RD004 and RD002 | Level 2 (Self) optional for this buy under RD004's phase-in; 7012 safeguarding applies to the CDI |
| SPMYM327Q2006, stationary tapered keys | DLA office at Portsmouth Naval Shipyard | November 10, 2026 | "This procurement requires CMMC Level 2 (Self) certification"; L40, 7021, 7025 | Quotes without an active Level 2 (Self) status "will not be considered for award" |
| SPE604-25-R-0405, amendment A0009, PJM electricity | DLA Energy | December 16, 2025 | Added 7021 and L39 | Final Level 1 (Self) in SPRS required |
| SPE604-26-R-0403, amendment 0003, natural gas, Northeast region | DLA Energy | October 14, 2026 | Removed 7021, 7025 and L39 | No CMMC status needed for this buy after the amendment |
The lesson from the last row is to read every amendment. A DLA solicitation can gain a CMMC requirement, lose one, or change level after you start your quote.
What the July 13, 2026 suspension changed for DLA buys
DoD's July 13, 2026 memo suspended CMMC Phase 2, which had been set to start November 10, 2026. The DoD CIO's CMMC page still says, as of November 13, 2026, that "All Phase I self-assessment requirements remain firmly in place" and that the program "may only require self-assessments at two levels." DoD has not announced an end date.
| Question | Answer for DLA suppliers | Source |
|---|---|---|
| Can a DLA buy require Level 1 (Self) or Level 2 (Self) today? | Yes. Those are the only two levels a requiring activity may designate during the review | July 13 memo; Class Deviation 2026-O0025, Revision 3 |
| Can a DLA buy require Level 2 (C3PAO) or Level 3 (DIBCAC) today? | No. Program managers "may not designate" those levels, and active solicitations that had them must be amended | July 13 memo |
| What about existing contracts with a C3PAO requirement? | Contracting officers remove it by modification before the next option or at the next administrative modification | July 13 memo; Revision 3 |
| Are waivers available? | No CMMC waivers during the review | July 13 memo |
| Does DFARS 252.204-7012 still apply? | Yes, with NIST SP 800-171 Revision 2 as the baseline | Revision 3; DoD CIO |
| Does DLA's own CMMC page reflect the suspension? | Yes. DLA’s page announces the suspension at the top, but its original phase schedule remains on the page. | DLA Cybersecurity Resources |
| Which NIST revision do I assess against? | Revision 2. DLA's page mentions Revision 3 for the Level 2 affirmation, but DoD CIO and 32 CFR 170 use Revision 2 | DoD CIO |
DLA's page also lists 17 Level 1 practices in one step. The current Level 1 requirement is the 15 safeguards in FAR 52.204-21 (52.240-93 in overhaul-format buys), per DoD CIO. When DLA's summary and the rule differ, follow the rule.
Which DLA supply classes expect CMMC
DLA's supplier page says the agency "anticipates 25% of its total procurements to require CMMC" and breaks the expected levels out by supply class. DLA built this table before the suspension, so we added a column for what it means today.
| DLA supply class | Expected CMMC levels (DLA) | During the suspension |
|---|---|---|
| Class I: subsistence, food, utensils, paper products, bottled water | Level 2 Self 95%, Level 2 C3PAO 5% | Level 2 (Self) is the ceiling |
| Class II: clothing, individual equipment, tentage, tool kits, hand tools | Level 2 Self 70%, Level 2 C3PAO 30% | Level 2 (Self) is the ceiling |
| Class III: fuels, lubricants, oils, gases, bulk chemicals, coal | Level 1 95%, Level 2 Self or C3PAO 4%, Level 3 1% | Mostly Level 1 (Self) |
| Class IV: construction materials, installed equipment, barrier materials | Level 2 Self 72%, Level 2 C3PAO 28% | Level 2 (Self) is the ceiling |
| Class VIII: medical materiel and medical-peculiar repair parts | Level 2 Self 98%, Level 2 C3PAO 2% | Level 2 (Self) is the ceiling |
| Class IX: repair parts, kits, assemblies, consumables | Level 2 Self 77%, Level 2 C3PAO 23% | Level 2 (Self) is the ceiling |
| Service contracts: DCSO, Disposition, Distribution, logistics IT | Level 1 1%, Level 2 Self 12%, Level 2 C3PAO 73%, Level 3 10% | Level 2 (Self) is the ceiling; watch for higher levels if DoD restores them |
DLA adds: "Table depicts general applications of levels. Solicitations are the official source for each requirement." DLA also says it has identified the specific National Item Identification Numbers (NIINs) that will need Level 2 or Level 3, but its public page does not post that list. The way to see it for your items is the RD004 or RD005 code on each RFQ.
What counts as CUI and FCI on a DLA buy
| Information | Category | Level it points to |
|---|---|---|
| Drawings and specs for an item coded RD004 | CUI, Controlled Technical Information | Level 2 |
| Technical data for an item coded RD005 | CUI, Export Control | Level 2 (C3PAO path, not designatable during the suspension) |
| Item or data coded RD002 | Covered defense information under 7012 | 7012 safeguarding; Level 2 if the buy names it |
| Contract information not meant for public release, such as delivery details under your award | FCI | Level 1 |
| Simple transactional information, such as what is needed to process payments | Excluded from FCI by FAR 4.1901 | None by itself |
| Purely COTS items | Outside the CMMC clause | DLA and the deviation exclude buys solely for COTS |
The FCI definition, quoted on the DoD CIO page, covers information "provided by or generated for the Government under a contract" and not intended for public release. If you download restricted drawings from DIBBS, you also need Joint Certification Program approval. DD Form 2345 and JCP certification covers that application. JCP decides who can receive export-controlled data. CMMC covers how you protect it.
Automated awards, manual awards and the COTS exception
DLA's page splits CMMC by award type. "For DLA automated orders, DLA will provide Suppliers with a window to achieve certification." For manual awards, "DLA may integrate the CMMC Levels when the requiring activity requires CMMC and in alignment with the phased rollout." DLA's page says that at full implementation in November 2028, it will primarily accept Final status and accept Conditional status "only in limited case-by-case exceptions (DLAD 4.7503)."
The COTS exception matters to DIBBS distributors. The deviation prescribes 7021 "except for those solely for the acquisition of commercially available off-the-shelf (COTS) items," and 7012 and 252.240-7997 carry the same exception. A part built to a government drawing is not COTS. CMMC for VARs and resellers explains where that line falls.
Scoping a DLA supplier: where the drawings live
Your assessment covers every system that processes, stores or transmits the CUI. For most DLA suppliers, the CUI is the technical data package that comes with an RD002, RD004 or RD005 item.
| Where DLA data shows up | Asset type under 32 CFR 170.19 | What it pulls into scope |
|---|---|---|
| The PC used to download drawings from DIBBS | CUI asset | Access control, MFA, patching, malware protection, audit logs |
| Email used to send drawings to a manufacturer or plater | CUI asset (and the email service) | FIPS-validated encryption; FedRAMP Moderate or equivalent cloud under 7012 |
| CAD/CAM workstations and file shares | CUI asset | All 110 requirements that apply to the system |
| CNC machines or test stations loaded with program files from the drawing | CUI asset or specialized asset | Documented in the SSP and asset inventory |
| Firewall, endpoint protection and backup tools | Security protection asset | The requirements tied to the function they provide |
| Printed drawings on the shop floor or in the quote file | CUI media | Physical protection, media marking and destruction |
Two ways to shrink scope
- Keep DLA drawings in one place. A CUI enclave or a GCC High tenant used only for controlled drawings keeps the rest of the office out of scope. CUI enclave providers compares options.
- Stop emailing drawings around. Every inbox that receives a drawing joins the assessment. Share from the enclave instead.
Our CMMC scoping guide covers asset categories in more depth.
Level 1 or Level 2 for a DLA supplier
| Level 1 (Self), procurement note L39 | Level 2 (Self), procurement note L40 or 7021 at Level 2 | |
|---|---|---|
| Requirements | 15, from FAR 52.204-21 (52.240-93) | 110, from NIST SP 800-171 Revision 2 |
| Information covered | FCI | CUI, such as CTI drawings |
| Assessment | Every year | Every three years |
| Plan of action allowed | No; award needs Final status | Yes, limited; award can occur with Conditional status |
| Affirmation | After each assessment | After each assessment and every year |
| Where you post it | SPRS | SPRS |
| Typical DLA supplier | Fuel or utility supplier, distributor of non-technical items | Machine shop, assembler or dealer handling drawings |
A Level 2 (Self) status also satisfies Level 1 for the same scope, per 32 CFR 170.16. If you quote both kinds of items, one Level 2 assessment of the same systems covers both. See CMMC Level 1 vs Level 2 for the full comparison.
How the Level 2 score works
| Rule | What it means for your quote | Source |
|---|---|---|
| Final Level 2 (Self) | All 110 requirements met | 32 CFR 170.16 |
| Conditional Level 2 (Self) | Score of at least 88 (0.8 of 110), with only eligible items on a plan of action | 32 CFR 170.21 |
| Award with Conditional status | Allowed for Level 2 under the deviation; Level 1 needs Final | Class Deviation 2026-O0025, Revision 3 |
| Plan of action items | Only 1-point requirements, plus 3.13.11 where encryption is used but not FIPS-validated | 32 CFR 170.21 |
| Never on a plan of action | 3.1.20, 3.1.22, 3.12.4, 3.10.3, 3.10.4 and 3.10.5 | 32 CFR 170.21 |
| Closeout | Close every open item within 180 days, or the conditional status expires | 32 CFR 170.21 |
| MFA (3.5.3) | 5 points off if no MFA; 3 off if only remote and privileged users have it | 32 CFR 170.24 |
| Affirmation | A senior Affirming Official affirms after each assessment and every year | 32 CFR 170.22 |
| Evidence | Keep assessment artifacts for six years from the status date | 32 CFR 170.15 and 170.16 |
A score you can't support is a legal risk as well as a compliance gap. See what happens if you lie on your SPRS score.
Step by step: from CAGE code to an awardable DIBBS quote
- Check SAM and your CAGE code. SPRS records tie to CAGE codes, and the Level 1 and Level 2 SPRS entries list every CAGE code in the assessment scope.
- Get SPRS access. Register in PIEE and request the SPRS Cyber Vendor User role. DLA's page links SPRS training on the Level 1 and Level 2 entries.
- Pull your item codes. For each NSN you quote, note RD002, RD003, RD004, RD005, L39 and L40, and the level named in 7021 or 7025.
- Map where the drawings go. List the PCs, mailboxes, cloud services, machines and subcontractors that touch the technical data. Decide whether you will use an enclave.
- Fix the items that can't be deferred. The six never-POA&M requirements, MFA and FIPS-validated encryption come first.
- Write the system security plan. Requirement 3.12.4 needs it, and it can't go on a plan of action. Our SSP template guide shows the structure.
- Assess all 110 requirements. Use NIST SP 800-171A procedures. Put open 1-point items in a plan of action with real dates.
- Enter the Level 2 (Self) assessment in SPRS. Use the guidance on SPRS's CMMC page. The record includes the status date, scope, CAGE codes and score.
- Have your Affirming Official affirm it. SPRS assigns a CMMC unique identifier (UID) to the assessment. The deviation has contracting officers check SPRS status for each UID you provide.
- Quote with the UID ready. Contracting officers check SPRS before award and before exercising options.
- Confirm your subcontractors. Under 32 CFR 170.23, a sub that handles only FCI needs Level 1 (Self), and a sub that handles CUI needs at least Level 2 (Self).
- Calendar the renewals. Reassess every three years and affirm every year. See CMMC annual affirmation.
Distributors, manufacturers and subtiers: who needs their own SPRS entry
| Role on a DLA buy | Own SPRS entry? | Why |
|---|---|---|
| Manufacturer quoting direct to DLA with drawings | Yes | It is the offeror and its systems hold the CUI |
| Distributor or dealer that receives the drawings and passes them on | Yes, at the level of the data it handles | Its email and file systems hold the CUI |
| Distributor quoting a COTS item with no drawings | Usually no CMMC clause | Buys solely for COTS are excluded |
| Manufacturer working for a distributor | Yes, if it receives CUI | 32 CFR 170.23 flows CMMC to every tier that handles FCI or CUI |
| Plater, heat treater or test lab that receives drawings | Yes, if it receives CUI | Same flowdown rule |
| Freight carrier delivering the finished part | Only if it receives FCI or CUI | Same flowdown rule; a carrier that never sees the technical data is not handling CTI |
Primes and distributors verify a supplier's status in SPRS. How to verify a company's CMMC status in SPRS explains the lookup.
What CMMC Level 2 costs a DLA supplier
DoD's CMMC final rule estimates the cost of the assessment itself, not the cost of fixing gaps.
| Cost item | DoD estimate for a small entity | What it leaves out |
|---|---|---|
| Level 1 self-assessment and affirmation | $5,977 | Fixing gaps |
| Level 2 self-assessment and affirmation | $34,277 | Implementing the 110 requirements, which DoD assumes is already done |
| Level 2 over three years | $37,196 (one assessment plus two annual affirmations at $1,459) | New tools, licenses and staff time |
| Third-party (C3PAO) certification | Can't be required during the suspension | See C3PAO assessment cost if a prime asks for one anyway |
For a shop that already quotes DLA, the larger costs are usually an enclave or GCC High tenant for drawings, MFA, managed endpoint protection and logging, and time to write the SSP and policies. CMMC self-assessment cost breaks those out.
Free and low-cost help
DLA's supplier page points vendors to these no-cost resources:
- APEX Accelerators for free government contracting help, including SPRS. See APEX Accelerator CMMC help.
- Project Spectrum for free training on every Level 1 and Level 2 control, templates and advisor sessions.
- NSA Cybersecurity Collaboration Center, which offers qualifying DIB companies protective DNS, attack surface management and penetration testing at no cost.
- SPRS training linked from DLA's page, including the Level 1 entry and Level 2 self-assessment tutorials.
Our CMMC grants and funding guide lists state programs.
A 90-day plan for a DIBBS supplier
| Window | Goal | Done when |
|---|---|---|
| Days 1 to 15 | Know your exposure | Item codes logged for every NSN you quote; SAM, CAGE and PIEE current; drawing flow mapped |
| Days 16 to 45 | Fix the hard items | MFA everywhere drawings live; FIPS-validated encryption for email and storage; visitor log and escort rules for the shop |
| Days 46 to 70 | Document | SSP written; policies approved; asset inventory and network diagram done |
| Days 71 to 90 | Assess and post | All 110 requirements scored with evidence; open items on a plan of action; score entered and affirmed in SPRS; UID on file for quotes |
RD004's mandatory date is November 10, 2028, 728 days from November 13, 2026. L40 buys are already here, so the 90-day plan is the safer pace.
Common mistakes DLA suppliers are making
- Treating RD004 as a hard requirement today, or ignoring it. It is a phase-in notice until November 10, 2028. L40 and a Level 2 7021 clause are the hard requirements.
- Reading the suspension as an end to CMMC at DLA. Level 1 (Self) and Level 2 (Self) stay in DLA buys, as the November 10, 2026 Portsmouth solicitation shows.
- Planning around DLA's December 2025 phase table. It predates the suspension. The C3PAO and Level 3 dates on it are on hold.
- Assessing against NIST SP 800-171 Revision 3. DoD enforces Revision 2.
- Skipping amendments. DLA Energy removed CMMC from one solicitation by amendment in October 2026 and added it to another in December 2025.
- Forgetting the subtier. The machine shop or plater you send drawings to needs its own status.
- Posting a score you can't support. Your Affirming Official signs it, and DoD can check self-assessments. See can DoD audit a CMMC self-assessment.
Which provider category fits a DLA supplier
| If you need | Provider category | Start here |
|---|---|---|
| A score, SSP and plan of action before your next L40 quote | Readiness consultant or RPO | CMMC consultant |
| One controlled place for DLA drawings | CUI enclave or GCC High provider | CUI enclave providers |
| Ongoing IT, MFA, logging and patching | Managed service provider | CMMC provider categories |
The CMMC provider categories page explains how these differ. Find My CMMC Path is free; we may receive a referral fee from providers, and providers can't pay for placement in a recommendation.
CMMC for DLA suppliers: FAQ
Do DLA suppliers need CMMC?
Only when the solicitation requires it. DLA adds CMMC through DFARS 252.204-7021 and 7025, procurement notes such as L39 and L40, and codes RD004 and RD005. DLA expects about 25% of its procurements to require CMMC. Buys solely for COTS items are excluded.
What does RD004 mean on a DIBBS RFQ?
The item's technical data is CUI in the Controlled Technical Information category. DLA's June 12, 2026 master list says uploading a Level 2 self-assessment to SPRS is optional until November 10, 2028 and required for award after that date.
What is DLA procurement note L40?
L40 is the CMMC Level 2 Self-Assessment Requirement (NOV 2025). With it, you need a current Level 2 (Self) status in SPRS before award. A November 10, 2026 DLA solicitation said quotes without that status "will not be considered for award."
What is DLA procurement note L39?
L39 is the CMMC Level 1 Self-Assessment Requirement for Federal Contracting Information (NOV 2025). You need a Final Level 1 (Self) status, which means all 15 safeguards met with no plan of action, entered and affirmed in SPRS.
Did the CMMC suspension stop DLA's CMMC requirements?
No. The July 13, 2026 memo stopped Level 2 (C3PAO) and Level 3 (DIBCAC) requirements. DLA buys can still require Level 1 (Self) or Level 2 (Self), and DFARS 252.204-7012 still applies.
Does RD005 mean I need a C3PAO now?
No. RD005 is a phase-in code with a November 10, 2028 date, and during the suspension no DoD buy may designate Level 2 (C3PAO). Protect export-controlled data under 7012 now and watch for DoD's reform decision.
Can I win a DLA award with a Conditional Level 2 (Self) status?
Yes, under the current deviation, if your score is at least 88 and only eligible items are open. You must close them within 180 days. Level 1 requires Final status. DLA's page says that from November 2028 it will accept Conditional status only case by case.
Do distributors need their own CMMC status?
Yes, if they receive or pass on CUI such as drawings. A distributor quoting COTS items with no technical data usually sees no CMMC clause.
Which NIST revision applies to DLA suppliers?
NIST SP 800-171 Revision 2. DLA's December 2025 page mentions Revision 3 in one place, but DoD CIO and 32 CFR 170 use Revision 2.
How much does Level 2 cost a small DLA supplier?
DoD estimates $34,277 for a small entity's first Level 2 self-assessment and affirmation, and $37,196 over three years. Those figures assume the 110 requirements are already in place, so fixing gaps costs extra.
What we verified
On November 13, 2026 we opened each source linked on this page: DLA's Cybersecurity Resources for Suppliers page (last updated December 12, 2025), DLA's Master List of Technical and Quality Requirements Version 44 (June 12, 2026) for RD002 through RD005, solicitations SPE7M127T2004 and SPMYM327Q2006, DLA Energy amendments to SPE604-25-R-0405 and SPE604-26-R-0403, the July 13, 2026 suspension memo, the DoD CIO CMMC page, Class Deviation 2026-O0025 Revision 3, FAR overhaul part 40, 32 CFR 170.15, 170.16, 170.19, 170.21, 170.22, 170.23 and 170.24, DFARS clauses 252.204-7012, 7019, 7020, 7021 and 7025, the CUI Registry, SPRS, DIBBS and the CMMC final rule cost estimates. We did not see the full DLAD procurement note text for L39 and L40; their titles come from the solicitations that use them. Solicitations change by amendment, so check your RFQ before you quote.
Sources
- DLA, Cybersecurity Resources for Suppliers (updated December 12, 2025)
- DLA Master List of Technical and Quality Requirements, Version 44 (June 12, 2026)
- RFQ SPE7M127T2004, circuit card assembly, DLA Land and Maritime (November 5, 2026), via GovTribe
- Solicitation SPMYM327Q2006, stationary tapered keys (November 10, 2026), SAM.gov
- DLA Energy SPE604-25-R-0405, amendment A0009 (December 16, 2025), via GovTribe
- DLA Energy SPE604-26-R-0403, amendment 0003 (October 14, 2026), via GovTribe
- DLA Internet Bid Board System (DIBBS)
- USW(A&S) memo 26-P-1023, Implementing Suspension of CMMC Phase 2 (July 13, 2026)
- DoD CIO, About CMMC
- Class Deviation 2026-O0025, Revision 3, FAR Part 40 and DFARS Part 240 (September 3, 2026)
- FAR Overhaul Part 40, Information Security and Supply Chain Security
- 32 CFR 170.15, CMMC Level 1 self-assessment
- 32 CFR 170.16, CMMC Level 2 self-assessment
- 32 CFR 170.19, CMMC scoping
- 32 CFR 170.21, Plan of Action and Milestones requirements
- 32 CFR 170.22, Affirmation
- 32 CFR 170.23, Application to subcontractors
- 32 CFR 170.24, CMMC Scoring Methodology
- DFARS 252.204-7012
- DFARS 252.204-7019
- DFARS 252.204-7020
- DFARS 252.204-7021
- DFARS 252.204-7025
- NIST SP 800-171 Rev 2 (PDF)
- NIST SP 800-171A, Assessing Security Requirements for CUI
- CUI Registry: Controlled Technical Information
- CUI Registry: Export Control
- SPRS CMMC resources
- SPRS NIST SP 800-171 assessment guidance
- CMMC Program final rule, 89 FR 83092 (October 15, 2024)
- APEX Accelerators
- Project Spectrum